Once free slide the drip edge out and discard.
Nails in gutter after roof.
However when permitted it is best to have the roof shingles hang over the drip edge by a minimum of 1 4 and a maximum of 3 4.
When combined with the drip edge spacing the shingles will clear the fascia by 3 4 1 1 4 total.
Lower the gutter with the aid of an assistant so you avoid twisting it if you plan to reuse it.
2 pry up with a cat s paw or nail puller the nails in the drip edge s bottom flange where it.
They angle down over the inner edge of the gutter eliminating any gaps between the.
Always set the nails back close to the edge of the roof leg.
These l shaped lengths of metal flashing attach to the edge of the roof under the shingles with roofing nails.
This will create damage on your roof shingles and therefore the shingles will no longer do their job at protecting your home properly from the intrusion of water.
Nailing into the roof.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
It can be done.
In some locations it is acceptable for the roof shingles to line up with the drip edge.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Gutter nails or spikes used to hold rain gutters in place can work themselves loose with seasonal movement.