The cooler the weather the longer the curing time.
Patching concrete floor after rough plumbing.
How to cut a concrete floor for new plumbing.
Well the contractor walked mid job so i ll be gc ing after all.
The temperature of the existing concrete must remain above 50 degrees for the first 24 to 48 hours after the patch is applied.
Vinyl concrete patcher is ideal for making smooth repairs to crack or chipped concrete floors sidewalks or steps.
For a texture pull a damp push broom over the concrete.
The pictures below see next post are how the contractor left the work.
This is part of a bathroom remodeling project.
How to repair a hole in the floor of a slab foundation.
Vinyl concrete patch repair quikrete 40 lb.
It has strong adhesive properties allowing it to be applied down to a featheredge.
During new construction the builder installs drain lines and stubs that will connect to future plumbing fixtures before he pours the slab on grade.
How to repair a hole in concrete floor in this video renos does a floor repair on a concrete floor.
Wait at least 24 hours before walking on the patch and a week before driving on it.